Montenegro’s legalisation programme for unauthorised and non-compliant buildings is facing a prominent case near Tivat, involving a hotel located inside the buffer zone of the UNESCO-protected Natural and Culturo-Historical Region of Kotor. The property is Ollie’s hotel at Opatovo near Tivat, owned by Gugi Commerce. The building has a reported gross area of approximately 3,149 square metres.
Gugi Commerce submitted its legalisation application in February 2026. Since the property exceeds 500 square metres, the procedure falls under the responsibility of the relevant state-level authority rather than the local administration. The case has gained wider significance after Montenegro’s Administration for the Protection of Cultural Property said it had not been consulted during the legalisation procedure, despite the hotel being situated in an area subject to heritage protection. The Administration has said it is examining the legal and administrative remedies available to it.
Legalisation Process Intersects With Heritage Protection
Montenegro has been working for years to address a large legacy of unauthorised construction, particularly along the coast, where residential, tourism and commercial development has frequently outpaced planning systems, permitting procedures and infrastructure investment. The legalisation framework is intended to bring existing properties into the formal system, establish clearer ownership and planning status, improve tax collection and reduce the number of properties operating outside a clear legal framework.
Such procedures become more complex in locations governed by additional cultural-heritage or environmental restrictions. The Bay of Kotor is among the areas where these requirements carry particular importance. The UNESCO-protected territory and its buffer zone are subject to additional scrutiny because construction, reconstruction and changes to the built environment can affect the area’s Outstanding Universal Value.
Consequently, legalisation in such locations involves more than property status. Planning, urban design, cultural heritage and potentially environmental requirements can also form part of the regulatory process. The reported absence of consultation with the cultural-protection authority could therefore expose the legalisation decision to further administrative examination if that institution was required to participate formally. For investors and developers, the issue concerns the extent to which a legalisation decision provides final certainty where another competent institution subsequently questions the procedure.
Criminal Proceedings Add Further Legal Exposure
The Opatovo case is also connected to separate criminal proceedings concerning alleged construction irregularities. Police filed a criminal complaint in February 2024, alleging that construction had taken place outside the approved documentation.
The Basic State Prosecutor’s Office in Bar later submitted an indictment proposal on 26 May 2026 against the company and Branislav Savić, concerning alleged construction without the required notification and accompanying documentation. The allegations remain subject to judicial proceedings and do not constitute findings of guilt. The simultaneous existence of legalisation proceedings and criminal allegations demonstrates the potential overlap between historical construction activity, planning compliance and subsequent efforts to regularise a property.
For financial institutions, institutional investors and potential purchasers, this increases the importance of examining the complete approval history rather than relying solely on the existence of a construction permit, operating licence or legalisation decision. The participation of all relevant authorities and the sequence of approvals can become significant elements of property due diligence.
Implications for Montenegro’s Tourism Investment Market
The issue also comes as Montenegro seeks to expand tourism and real-estate investment while strengthening institutional standards in preparation for European Union membership. The coastal market has attracted substantial foreign capital, particularly in Tivat, Kotor, Budva and Herceg Novi, where hotels, marinas, luxury residential developments and mixed-use projects have reshaped parts of the coastline.
That development has also highlighted challenges involving spatial planning, municipal infrastructure and construction oversight. For investors, predictable and legally robust permits are important. Municipal authorities need development to be supported by adequate infrastructure, while heritage institutions must ensure that protected areas are maintained despite continuing development pressure. Montenegro’s legalisation policy therefore faces the task of regularising existing structures without creating a system in which construction that might have received greater scrutiny as a new project is retrospectively approved.
EU Accession Increases Administrative Requirements
This issue is becoming more relevant as Montenegro advances through the EU accession process. Administrative consistency, rule-of-law enforcement and transparent permitting are increasingly important within Montenegro’s accession framework. Real estate and tourism projects intersect with planning, construction, environmental protection, cultural heritage, public procurement and public administration reforms. As Montenegro aligns its institutions with the EU acquis, projects are increasingly subject not only to domestic regulatory practice but also to expectations concerning institutional standards.
The Bay of Kotor carries an additional international dimension because of its UNESCO status. The area has previously attracted scrutiny over development pressure, particularly around Kotor and the wider bay. Any perception that legalisation procedures have excluded specialist heritage authorities could therefore extend the significance of the issue beyond the immediate administrative proceedings. For the government, the case raises the question of whether the legalisation framework contains adequate safeguards for properties situated in protected areas.
Property Due Diligence Becomes More Important
For developers and property investors, the case also demonstrates the importance of a more comprehensive due-diligence process. Coastal Montenegro has historically been regarded as a market where planning problems could sometimes be addressed administratively after acquisition or construction. Increasingly formalised permitting and stronger institutional oversight can make historical irregularities significant financial liabilities. Potential risks can involve land title, construction permits, urban-planning parameters, heritage requirements, environmental obligations, infrastructure connections and outstanding administrative procedures.
Such issues can influence the financing of a project, the resale prospects of a property, the licensing position of an operator and a developer’s ability to refinance or expand an existing development. The requirements are particularly significant for properties located within protected areas, where investors need to establish that planning approvals, cultural-heritage consents, environmental requirements and construction documentation have been properly coordinated.
Legalisation Framework Faces Institutional Scrutiny
Montenegro nevertheless has a substantial economic interest in resolving the status of thousands of irregular structures. Keeping such properties outside the formal planning and tax system indefinitely also creates economic and administrative problems. The legalisation process therefore has to distinguish between historical irregularities of limited significance and major commercial developments located in areas with environmental or cultural sensitivities.
At approximately 3,149 square metres, the Opatovo hotel represents the latter category. Its size and location do not determine the outcome of the proceedings. They do, however, make the integrity of the procedure particularly relevant, including whether all competent institutions were consulted and whether the resulting decision can withstand administrative and judicial scrutiny.
The immediate issue is whether the legalisation decision for Ollie’s hotel remains in effect, is subject to review or faces a formal challenge. The proceedings will also determine how Montenegro handles legalisation procedures involving substantial commercial properties in protected areas, where planning and heritage requirements intersect with investment and tourism development.



