Luka Bar has started handling coal cargo for Serbian electricity production under an agreement with Srbija Kargo, creating an opportunity to expand port activity while putting the competitiveness of the wider transport route to the test.
The port company said work under the agreement began in September for cargo destined for Elektroprivreda Srbije (EPS). Luka Bar described the contract as business won in competition with other regional ports. The company did not disclose the contract value or the volume of cargo covered by the agreement.
Luka Bar volumes remain below previous levels
The new business comes as Luka Bar has recorded lower cargo volumes in recent years. Luka Bar AD handled 684,332 tonnes in the first half of 2026, generating approximately €6.44 million in revenue, according to company figures reported in September. Annual throughput at Luka Bar AD fell from 1.907 million tonnes in 2023 to 1.729 million tonnes in 2025. The figures refer specifically to Luka Bar AD and do not cover all operators or cargo activity within the wider port complex. Port of Adria operates separately, and its results cannot be combined with those of Luka Bar without an appropriate consolidated dataset.
Full-route costs determine competitiveness
For customers using the route, port handling charges represent only one part of the overall cost. Maritime services, unloading, storage, inland transport, border procedures, delivery reliability and the cost of delays all affect the competitiveness of the corridor. Bulk cargo also requires coordination of storage capacity, handling productivity, wagon availability and the timing of vessel arrivals and inland departures.
Delays at one stage can affect the rest of the operation. Cargo arriving faster than it leaves the port can accumulate and occupy storage capacity, while available rail capacity can remain underused if vessel unloading is delayed and equipment and personnel are left waiting. Coordinated scheduling across the route is therefore important to the overall performance of the service.
Contract provides a regional cargo opportunity
The Serbian coal business demonstrates that Luka Bar can compete for a defined regional cargo flow, but the agreement alone does not establish a permanent increase in port volumes. Its longer-term contribution will depend on the duration of the agreement, the purchasing requirements of the customer and the consistency of deliveries.
Cargo diversification is also relevant to the port’s volume base. Dependence on a limited number of commodities can leave activity exposed to changes in industrial demand, mine production and purchasing decisions beyond the port’s control. Adding new cargo categories can reduce such dependence, although different commodities may require specific equipment, storage arrangements and commercial relationships. The value of diversification depends on the profitability of the additional business after those requirements are taken into account.
€175 million railway modernisation package
Rail infrastructure is another element of the longer-term proposition. The Bar–Golubovci railway modernisation package is valued at €175 million, comprising a €63 million EIB loan and a €112 million EU grant under financing announced in May.
The investment is intended to improve railway capacity, efficiency and safety, but the financing does not mean that those improvements have already been delivered. The commercial benefits of greater rail capacity will also depend on operating conditions beyond the physical infrastructure. Track quality needs to be matched by locomotives, wagons, staffing, timetables and coordination across borders. For shippers, greater infrastructure capacity is useful only when dependable transport slots are available across the complete service.
Logistics services add value around port operations
Montenegrin logistics companies can participate through forwarding, cargo inspection, equipment maintenance, warehousing and transport coordination. Such services can retain additional value in Montenegro even when the cargo is ultimately destined for another market.
Digital tracking and reliable documentation can further support the service by allowing customers to determine where cargo is located, when it is expected to move and which party is responsible for addressing an interruption.
Environmental performance is another operating consideration for bulk cargo. Dust control, handling procedures and suitable storage arrangements form part of normal operations, while company assurances do not replace measured performance or oversight. The new Serbian contract gives Luka Bar an opportunity to demonstrate that customers can use the port as a reliable and competitive route. The extent to which the business becomes recurring cargo will depend on performance and costs across the full journey.



