The Traffic Administration has announced a tender for the reconstruction of the Mojkovac–Vragodo road, which includes the construction of a bridge over the Tara River, the institution said in a statement.
The construction of the bridge in Podbišće is considered highly significant, as it will connect the main highway with the road leading to the future ski resort, improving traffic connectivity and accessibility in the area.
The estimated value of the works is 3.1 million euros excluding VAT. The proposed deadline for completion cannot be shorter than 14 or longer than 24 calendar months from the date the contractor begins work.
The Traffic Administration emphasized that it continues to plan, build, and modernize regional and main roads throughout Montenegro with the goal of improving road safety and ensuring better connectivity across the country.




