The construction of a 400 kV transmission line from Lastva to Pljevlja is the most important energy project in Montenegro and beyond, and without its realization…
Browsing: electric transmission system
The Montenegrin Electric Transmission System (CGES) ended last year with a net profit of EUR 21.4 million, of which, in accordance with the law, approximately EUR…
The energy connection between Lastva and Brezna will reduce losses in the transmission network by over half a million EUR per year, the Montenegrin Electric Transmission…
In the following period, the continuation of the positive trend of good results and continuous business sustainability is expected, the report adds During the first nine…