Since the beginning of the year, the Sozina Tunnel has served 2.26 million vehicles.
According to data from Monteput, the company managing the tunnel, 3.78 million vehicles passed through Sozina in the previous year.
In 2023, the tunnel saw 3.52 million vehicles, up from 3.07 million in 2022.
The Sozina Tunnel was opened in July 2005. Its construction cost approximately 74 million euros, with Montenegro providing 50 million euros and the remaining 24 million financed by a loan from the European Investment Bank (EIB).
The tunnel is 4.19 kilometers long and connects the coastal region with central Montenegro.