Since the beginning of the year, the Sozina Tunnel has served 1.87 million vehicles.
According to data from Monteput, the company that manages the tunnel, 3.78 million vehicles passed through Sozina last year.
In 2023, the tunnel saw 3.52 million vehicles, compared to 3.07 million in 2022.
The Sozina Tunnel was opened in July 2005. Its construction cost approximately €74 million, of which Montenegro funded €50 million, while €24 million was secured through a loan from the European Investment Bank (EIB).
The tunnel is 4.19 kilometers long and connects the coastal region with the central part of Montenegro.