The Podgorica company Somsol plans to build a solar power plant in the Somina settlement in Nikšić, with a maximum power of 240 MW.
As it was announced, the Government issued the investor with urban technical requirements for the preparation of technical documentation.
-According to previous analyzes conducted by the investor, it was determined that 240 MW is the maximum possible capacity of the future solar power plant. In accordance with the Law, all the necessary opinions of the competent authorities were previously obtained – it was stated in the discussion.
Saturday, December 6
Trending
- Surge in FDI anticipated as investors target tourism, logistics, and real estate megaprojects
- Montenegro anticipates slower 2025 growth, but structural reforms may shift the outlook
- Real economy under pressure: Industry expands modestly while services drive growth outlook
- Business groups urge regulatory stability as reforms speed up EU alignment
- Montenegro’s public debt steady at 58.6% of GDP, bolstering investor confidence
- Foreign investor interest rises as Montenegro emerges as the Adriatic’s undervalued opportunity
- Gambling revenues jump 30% — what soaring leisure spending says about domestic demand
- Tourism and air travel boom mark Montenegro’s strongest post-pandemic recovery




