The Podgorica company Somsol plans to build a solar power plant in the Somina settlement in Nikšić, with a maximum power of 240 MW.
As it was announced, the Government issued the investor with urban technical requirements for the preparation of technical documentation.
-According to previous analyzes conducted by the investor, it was determined that 240 MW is the maximum possible capacity of the future solar power plant. In accordance with the Law, all the necessary opinions of the competent authorities were previously obtained – it was stated in the discussion.
Sunday, December 7
Trending
- Calls for government to thoroughly review agricultural producers’ demands
- Average net wage hits €1,020 in October, signaling gradual income growth
- Apartment prices may rise following VAT increase on construction land, URA says
- Montenegro starts enforcing new Consumer Credit Law
- Montenegro confronts growing fiscal pressures amid slowing economic momentum
- Banks provide Montenegro with €450 million to strengthen fiscal reserves
- Is investing truly risky — or is security the biggest illusion?
- Mohamed Alabbar announces major AI initiatives in Montenegro




