The Podgorica company Somsol plans to build a solar power plant in the Somina settlement in Nikšić, with a maximum power of 240 MW.
As it was announced, the Government issued the investor with urban technical requirements for the preparation of technical documentation.
-According to previous analyzes conducted by the investor, it was determined that 240 MW is the maximum possible capacity of the future solar power plant. In accordance with the Law, all the necessary opinions of the competent authorities were previously obtained – it was stated in the discussion.
Sunday, October 26
Trending
- Montenegro cracks down on illegal construction: 70 buildings sealed in Žabljak
- Over 8,000 Montenegrin users switched operators through number portability in 2025
- Montenegro to relaunch “Limited Prices” campaign focused on domestic products
- Wizz Air base strengthens Montenegro’s tourism and highlights need for state control over airports
- EPCG leadership change boosts Montenegro Stock indexes amid lower trading volume
- Old vs. New: Quality, costs and living conditions in Podgorica apartments
- Incheon International Airport Corporation tops bidding for Montenegro airport concession
- EPCG pays over €80 million for environmental reconstruction of TPP Pljevlja




